A practical checklist for hiring in Malta and Gozo: confirming authorisation on the REWS public list, matching the category to the job, writing a brief the electrician can price, and knowing what paperwork you are owed at the end.

If you have arrived from the UK, the instinct is to look for an NICEIC or NAPIT badge. Malta does not work that way. The gatekeeper here is the Regulator for Energy and Water Services (REWS), which authorises individual electricians by category and publishes who holds what. That register is the one check worth doing before anything else — but it is worth being clear from the start about what it proves. It proves a person is authorised to do a class of work. It says nothing about whether they are any good, whether they turn up, or what they charge.
Match the authorisation to the job
REWS recognises three levels of electrical installation provider.
| Category | Scope |
|---|---|
| Authorisation A | Single-phase installations |
| Authorisation B | Single and three-phase installations below 300 A |
| Warranted electrical engineer | Three-phase with no current limit, and grid-tied generators |
Most domestic work in a flat or a terraced house sits inside Authorisation A. A villa, a block with shared services, a small commercial unit or anything pulling three-phase moves you to B. If you are installing a grid-tied generator — which in practice is how a photovoltaic array connects — that is warranted-engineer territory, not A and not B.
Get this right before you collect quotes. An Authorisation A holder quoting on a three-phase board is quoting on work he is not authorised to certify, and you will find out at the paperwork stage, which is the worst possible moment.
Verify the person, not the van
REWS publishes the lists on its authorised providers page: the A and B lists were updated on 6 August 2026 and the warranted engineers list on 27 February 2026. Separately, Regulation 26 of S.L. 545.24 requires a public register carrying each provider's name, authorisation number and telephone number.
Regulation 25 requires authorised providers to hold a REWS identification card. Ask to see it, and check the number against the list rather than taking the card at face value. Falsely claiming to be authorised, with a card, is an offence carrying a fine of between €1,000 and €100,000 — which tells you how seriously the law treats the claim, and also that the law anticipates people making it.
It helps to know what the card represents. To be authorised at category A an applicant must pass an exam and document at least 12 months of single-phase experience. Category B requires at least 24 months of three-phase experience gained under a B holder or a warranted engineer. Applicants also submit a medical declaration and a police conduct certificate. The fees are €12 to apply, then €35 for A or €70 for B every three years. So the card means: examined, time-served, screened, and currently paid up. It does not mean inspected, reviewed or rated.
Nobody is grading workmanship
There is no Maltese equivalent of a consumer body that scores electricians on price or quality of finish. The REWS register is a licensing list. Beyond it, the practical advice in the trade guides is the ordinary advice: hire a certified electrician rather than the cheapest bidder, read reviews, and ask for references, proof of insurance and a written quote before anyone starts. Guidance on hiring trades in Malta also recommends taking dated photographs before work begins and insisting on VAT-compliant invoices.
Treat reviews as the soft evidence they are. The register is the hard check; everything else is judgement.
Decide what actually needs an electrician
Not every job does. A handyman can swap a light fitting or a socket cover. New wiring, new circuits and anything at mains level need a licensed electrician. Shell-form purchases blur this line, because a shell has no circuits at all and almost every decision you make is a first-fix decision — so the whole fit-out is electrician work from the outset, not a sequence of small jobs you can parcel out.
Write the brief before you ask for prices
Three electricians pricing three different mental pictures of your job will give you three numbers that cannot be compared. Give them all the same document.
- A written scope. Room by room: how many sockets, where, at what height, which circuits are dedicated, what is being left for later.
- Photographs. Dated, taken before anyone starts, of the existing board, meter position, any visible runs and the condition of walls and ceilings.
- The board location. Say where you want the distribution board, or say that you want advice on it. In an apartment this is often constrained by the common parts, and condominium rules bind what you may cut, chase or route through shared structure — flag that in the brief rather than discovering it mid-job.
- What you want certified. State explicitly that you expect the completion form and accompanying drawings for the whole installation, not just the part that is new.
- Access and logistics. Parking, lift, working hours agreed with neighbours. For a property in Gozo, say so plainly: every delivery and every forgotten part means a ferry crossing, and an electrician pricing the job needs to know that before quoting, not after.
What a good written quote itemises
A quote worth comparing should contain a written scope, unit costs for parts, the safety and testing steps included, an estimated timeline and what post-install support is offered. The warning attached to that advice is the useful part: the cheapest quote can end up costing more if testing or compliance steps have quietly been left out of it. If two quotes differ sharply, find out whether one of them has simply dropped the testing line.
What you are entitled to at the end
Regulation 14 is the clause to remember. On completion, the provider gives the owner a copy of the form, together with a schematic and a wiring layout showing the circuits and the means and location of protection and isolation.
That is a drawing of your installation — where the circuits run, where the protective devices sit and where you isolate. It is the document the next electrician will ask for, the document a buyer's surveyor will want, and the one thing you cannot reconstruct cheaply once the walls are closed. Do not settle the final payment until you have it.
If the work is defective
Regulation 24 gives REWS the power to inspect an installation and order defects rectified at the provider's expense, with an administrative fine of €200 per day for continued non-compliance. Malpractice is reported through the REWS dispute resolution route.
This is a regulatory remedy, not a consumer-satisfaction service. It bites on defective and unsafe work, which is where the real risk sits — poor electrical work brings fire and failure risks, which is the reason the licensing regime exists at all. It is not a mechanism for recovering money on a job you simply did not like. Your leverage on finish, timeline and conduct comes from the written scope, the dated photographs and the retained final payment, not from the regulator.
The short version
- Identify whether the job is A, B or warranted-engineer work.
- Find the person on the REWS list, ask for the identification card, match the number.
- Ask for insurance, references and a written quote; take dated photographs first.
- Give every quoting electrician the same written scope, including board location and access.
- Compare quotes on what they itemise, not on the total.
- Insist on a VAT-compliant invoice, and on the Regulation 14 form with its schematic and wiring layout.
- Keep that paperwork with the deeds.
Common questions
- How do I check an electrician is authorised in Malta?
- REWS publishes lists of authorised electricians in categories A and B, and a separate list of warranted electrical engineers. The regulations also require a public register showing name, authorisation number and telephone number, and require authorised providers to carry a REWS identification card. Ask to see the card and match the number against the list.
- What is the difference between Authorisation A and Authorisation B?
- Authorisation A covers single-phase installations. Authorisation B covers single and three-phase installations below 300 A. Three-phase work with no current limit, and grid-tied generators, fall to warranted electrical engineers.
- What paperwork should I receive when the work is finished?
- Under Regulation 14 of S.L. 545.24, on completion the provider gives the owner a copy of the completion form together with a schematic and a wiring layout showing the circuits and the means and location of protection and isolation.
- Can a handyman do electrical work in Malta?
- A handyman may handle minor jobs such as swapping a light fitting or a socket cover. New wiring, new circuits and anything at mains level require a licensed electrician.
- What can REWS do if the work is defective?
- Under Regulation 24, REWS may inspect an installation and order defects rectified at the provider's expense, with an administrative fine of €200 per day for non-compliance. Malpractice is reported through the REWS dispute resolution route.
What we could not establish
- No Maltese body rates or vets authorised electricians on price or workmanship. The REWS register proves authorisation and nothing else, and the sources show no public list of complaints upheld or disciplinary action taken.
- The sources do not establish how long REWS takes to act on a complaint, or what the complainant has to provide to open one.
- The sources do not cover the supply side at all: no meter application, supply upgrade or distributor paperwork is described, so nothing here tells you how to get a new or larger supply connected.
- The sources give no benchmark hourly rates, day rates or job prices for Malta — only what a quote should contain.
- The sources do not state whether the completion form is chargeable, who holds the original, or how long an owner should keep it.
- Nothing in the sources addresses Gozo separately: there is no indication of a different register, different availability or any published allowance for travel and ferry time.
Sources
- Electrical Installations Authorised Providers — REWS · read 2026-10-05
- Application to Become an Authorised Electrician — REWS · read 2026-10-05
- S.L. 545.24 Electrical Installations Regulations — Laws of Malta · read 2026-10-05
- Electrician Cost in Malta — Malta Service Hub · read 2026-10-05
- Handyman Services Malta: 2026 Hiring Guide — Rozie.app · read 2026-10-05
- Electrician Cost in Malta (2026 Guide) — Check Your Traders · read 2026-10-05
Drafted with Claude — claude-opus-5, then read, corrected and approved by Neil Bennett before publication. We do not publish anything a person has not read.
Want this costed properly?
The calculator gives you a figure in a minute. A site visit gives you a fixed price.
Book a free survey