The completion certificate, the schematic and ARMS Form A — the paperwork a meter, a sale or an insurer needs.
Malta's regulations make certification mandatory for every new installation or rewire that needs a connection, every alteration between the meter and the main board, and any supply that has been off for more than six months. The certificate is a REWS-approved form signed by the authorised provider who built and tested the installation, and you receive a copy with the wiring layout.
For a new meter, ARMS Form A carries a technical certification section — the switchgear, the earthing arrangement, and a declaration of inspection and testing under S.L. 545.41 and S.L. 545.24 — that only an authorised electrician can complete, with a copy of their authorisation attached. Enemalta's connection fee is €300 for single-phase, €600 for three-phase 40 A and €900 for three-phase 60 A, plus €23.29 per metre beyond seven metres, and the application needs the Planning Authority compliance certificate number and photographs of the meter position.
There is no published Maltese fee for a certificate or an inspection report, and the law sets no fixed interval for periodic testing — the provider recommends one. Enemalta's fees are fixed and separate. The certificate line is quoted on site, usually as part of the job it certifies; fault finding is shown for what an inspection may lead to.
| Job | Unit | Band | What is in it |
|---|---|---|---|
| Inspection & completion certificate | report | quoted on site | the REWS-form certificate Enemalta/ARMS needs — no published fee, quoted on site |
| Fault finding / RCD tripping | per job | €60 – €150 | diagnosis of a tripping RCD, dead circuit or intermittent fault |
A band, not a quote: the low end is a straightforward job with clear access, the high end is the same job with the complications a site visit finds. Materials are included where the line says so.
Per job · €60 – €150. Add other jobs in the full calculator →
You deal with us, not with the trade. We visit, we quote a fixed price, we bring in a REWS-authorised electrician from the CheckYourTraders-verified network, and we stand behind the work. One point of contact, one contract, one invoice — and a certificate at the end.
The completion certificate, the schematic and ARMS Form A — the paperwork a meter, a sale or an insurer needs.
Book a free site visit →It opens like an app, and the cost calculator works without a signal.